Start with the information you already have.
A phone video of the ore and a short message are enough to begin. We will explain which missing facts can change the flowsheet and which details can wait.
Prepare a project briefProcess design before equipment selection Gold, tin, tungsten and chrome / 5–100 TPH
Start project review
Inside the Jiangxi workshop Real workshop view: large rotary mineral processing equipment during manufacturing preparation.
We develop flowsheets and coordinate equipment for 5–100 TPH gold and gravity concentration projects, based on ore characteristics and test results.
We review the ore type, capacity, feed size and site conditions, then confirm what information is still needed before recommending a flowsheet.
A phone video of the ore and a short message are enough to begin. We will explain which missing facts can change the flowsheet and which details can wait.
Prepare a project briefOre type, country, target TPH, feed size, photos, videos and any test or assay notes.
Clay, water, power, existing equipment, project stage and where valuable mineral may be lost.
Usually within one business day: likely flowsheet, missing data, test needs and equipment roles.
Our main focus is gold. We also design gravity circuits for tin, tungsten, chromite and other heavy minerals.
Washing, sizing and staged gravity recovery for free-washing or clay-rich placer material.
View solution →
Crushing, grinding and test-led recovery routes built around liberation and mineralogy.
View solution →Gravity circuits designed around cassiterite liberation, slime control and staged recovery.
View solution →Process routes for coarse and fine scheelite or wolframite recovery with controlled classification.
View solution →Washing, classification and gravity separation for chromite-bearing ore and tailings.
View solution →Gravity concentration assessments for tantalum-niobium, manganese, ilmenite, zircon and other dense minerals.
View solution →The initial project review is free. Testing, calculations and drawings are quoted separately; part of that cost may be credited toward a complete equipment order.
Review the ore, capacity, location and project stage.
Use representative samples to check gravity response and losses.
Define the flowsheet, operating logic and equipment roles.
Manage manufacturing, quality checks and project interfaces.
Prepare packing, documentation and export shipment.
These workshop photos show equipment during fabrication, assembly and delivery preparation in Jiangxi.
The video follows equipment through fabrication and assembly in our Jiangxi workshop. Plant capacity and recovery still depend on the ore and selected flowsheet.
Watch with technical contextIf the ore facts are unclear, the first answer should be a test route, not a full equipment list. Gravity test work, size checks and simple loss observations usually show which section needs attention first.
How testing informs the flowsheetEach case explains the feed conditions, selected flowsheet and equipment included in the scope. Use the closest case as a starting point for your own enquiry.
A 30 TPH rock gold circuit focused on fine gold recovery, water circulation and reduced civil work without a ball mill.
Send similar ore photos and we will check what information is still missing.A high-throughput alluvial gold plant covering screening, scrubber washing, gravity recovery and concentrate handling.
Send similar ore photos and we will check what information is still missing.A complete hard-rock gold line covering feeding, crushing, grinding, gravity concentration and smelting support.
Send similar ore photos and we will check what information is still missing.